Paving stones from the dam Ternopil pond is used to other objects

In Ternopil ongoing major reconstruction of the dam Ternopil pond on Ruska street. The project envisages the capital repair of hydraulic structures - sluice bridge and at the Park vdovushka in topil'che, and after the completion of these works on the carriageway will be redeveloped asphalt concrete surface on a reinforced basis. As says head of engineering and transport infrastructure Andrey Drozdovsky, the old cobblestones, which demotivate from the dam will be used in the repair of other about’objects. “During the reconstruction provides for the dismantling of paving blocks with an area of 1078 sq. m. All pavers will be transferred to the territory of the Contracting organization to store, we will also use it to repair other about’objects. In particular, the roadway near the Boulevard Shevchenko, with the device of the pedestrian zone on the street Bruckner, and so forth”. This was reported in the Ternopil city Council

Ïåðåâåäåíî ñåðâèñîì "ßíäåêñ.Ïåðåâîä÷èê": translate.yandex.ru.

Source: http://uzinform.com.ua/

ÂÂÅÐÕ