Chernivtsi: the Repair work on the street. will be resumed with the onset of favorable weather conditions

the Final stage of capital repairs of street of Bohdan Khmelnytsky will start with the beginning of the construction season. This was reported by the chief engineer of the municipal enterprise Paul miskshep Olor: "Now the weather is very changeable: in the coming weeks will drop rain and snow, night frosts are possible, so we can't dig up the sidewalks and to carry out waterproofing of the facade walls of the houses. If you start this work now, there is a risk of flooding of basements. Our company is fully ready to start work, has already received two million of the advance. At the final stage of the overhaul will involve all the necessary equipment and about 30 employees. Previously, we lost five months through conversion utilities, so now we plan to pass the the street in September". With the onset of favorable weather conditions the work will begin on site from street to University street Simovic. The roadbed, curbs, sidewalks on the street decided to build a natural stone in shades of gray, stripes at pedestrian crossings will also be tiled with natural stone in a contrasting color. The arrangement of space around the trees will be carried out with the use of modern technologies so that to increase the width of the sidewalk. This was reported in the Chernivtsi city Council

Ïåðåâåäåíî ñåðâèñîì "ßíäåêñ.Ïåðåâîä÷èê": translate.yandex.ru.

Source: http://uzinform.com.ua/

ÂÂÅÐÕ