In the Vinnytsia region in a secondary school S. Broslin Litinsky district, upgraded heating system (photo)

At the opening of the renovated boiler room was visited by Deputy Chairman of regional state administration Vasily Pivovar. He became acquainted with the quality of work performed. It should be noted that the work for the reconstruction of the outbuildings under the heating point on alternative fuels, the heating device and the heating system of secondary school of I - III stages Broslin S. Litinsky district spent 1356,7 thousand UAH. Of these, the state budget – 1312,4 ths. local – 44,4 thousand UAH. According to the Department of education and science of the regional state administration in the secondary school i-III St. S. Broslin enrolls 115 students. This establishment is functioning since 1972 with stove heating, which required reconstruction. In 2016 from the state and local budgets, funds were allocated for the reconstruction of the outbuildings under the heating point on alternative fuels, the heating device and the heating system of secondary school of I - III stages Broslin C. Litin district. Currently, the facility performed the following work: 1. The device of the heating system of the school premises. 2. Installed the foundations and the building heating item (block variant). 3. The device of external heating systems. 4. Installed boilers on alternative fuels and the capacity of the heat exchanger and water-supply. 5. Mounted dimovo pipe. 6. Completed piping boiler and pump groups. 7. Commissioning is carried out. This was reported in the Vinnytsia regional state administration

Ïåðåâåäåíî ñåðâèñîì "ßíäåêñ.Ïåðåâîä÷èê": translate.yandex.ru.

Source: http://uzinform.com.ua/

ÂÂÅÐÕ