In Zhytomyr region for 5 months of the road was carried out yamochny repair on 170 thousand square meters

From the beginning of 2017, branch of the SE "Zhytomyr Oblavtodor", together with state of emergency "Highway" eliminated the defects on the roads of General use 170 292 x square meters. Data as of 30 may provides road Service in Zhytomyr region. 170 of 292 square meters of road patching and repair of renovated path of the state value on 119761 sq m, rest of the area – roads of local and regional significance. In the future planned capital and current repairs of roads and bridges region. In 2017, the development of a network of roads of General use of Zhytomyr region for 2017 include funds of the state budget for: * construction and renovation – (land acquisition the reconstruction of the Northern bypass of the city of Zhytomyr and design and survey works of future periods); * major repairs – (the beginning of works on the southern bypass of the settlement of Zhytomyr – a/d Hlybochytsia - Stanyshivka through Kalinovka, Klitchyn and design and survey works); * current medium repair (repair of the roadway and the lighting device on separate sections of the M-21 Zhytomyr-Mohyliv-Podilskyi; start of construction works at R-18 Zhytomyr-Popilnia-Skvyra-stavyshche, P-28 vystupovychi-Zhytomyr; work on T-06-14 Hlybochytsia-Stanyshivka through Kalinovka, Klitchyn; commencement of works on certain sections of pavement and two bridges on the road H-03 Zhytomyr-Chernivtsi); * operating costs. This was reported in the Zhytomyr regional state administration

Ïåðåâåäåíî ñåðâèñîì "ßíäåêñ.Ïåðåâîä÷èê": translate.yandex.ru.

Source: http://uzinform.com.ua/

ÂÂÅÐÕ