KP "chernigovvodokanal" water Quality in the city under the control of

in Accordance with applicable law, providers of drinking water in Ukraine are obliged to inform subscribers about the quality of drinking water supplied to the network. In July 2017, KP "chernigovvodokanal" publishes the results of research of indicators of quality of drinking water in the city of Chernihiv, because, according to the volume of water sold by the company, informing the population about the quality of water intended for enterprise twice a year. Its characteristics of drinking water in Chernigov almost perfect. Moreover, it is not processed with any chemicals and is therefore useful for a person. Drinking water meets the standards and these standards are monitored daily. According to studies, only well of the village of Zarechnoye as 01.07.2017 had exceeded the standards for indicators such as: Iron General – 0,425 mg/dm3 at the rate established Dsanpin 2.2.4-171-10 at the level <0.2 mg/dm3; Turbidity – 1.7 mg/dm3 at the rate established Dsanpin 2.2.4-171-10 at the level < 1.5 mg/dm3. Exceeding the standards Dsanpin 2.2.4-171-10 at the well the village of Zarechnoye is not a violation, because the level of total iron and, as consequences, water turbidity, caused by the natural characteristics of artesian water in the territory of water intake. Such excess is allowable and provided for in the Technological rules of work of systems of the centralized water supply and drainage (http://zakon3.rada.gov.ua/laws/show/z0231-95,http://zakon3.rada.gov.ua/laws/show/z1062-14). Subscribers who receive their drinking water from wells in the village of Zarichne is constantly recalculating the cost of drinking water to decrease. It should also be noted that deviation from the standards Dsanpin 2.2.4-171-10 on the basis of Technological regulations of operation of the centralized water supply and sanitation will be valid until 2020. Therefore KP "chernigovvodokanal" deals with technologies for reagent-free sneszana water (no adding chemical compounds). The first plans to resolve the issue of deferrization of water intake facilities "Podravka", which is the most productive in Chernigov. According to plans, in 2017 the company will go on development of design documentation on construction of the station of deferrization of drinking water intake facilities "Podravka". More information about the developments in the issue of potable water in Chernihiv will be published in the near future. According to press service of the KP "chernigovvodokanal"

Ïåðåâåäåíî ñåðâèñîì "ßíäåêñ.Ïåðåâîä÷èê": translate.yandex.ru.

Source: http://uzinform.com.ua/

ÂÂÅÐÕ