In Ternopil, the repair of the pedestrian bridge over the railway track
In Ternopil continues the overhaul of a pedestrian bridge over Railways. As noted by the mayor of Ternopol Sergey Nadal, initially planned to hold only the maintenance of the stairs above the tracks, but after a survey Commission had identified significant deficiencies and therefore, it was decided to carry out major repairs. “Now fully fortified bridge and partly replaced structural elements, staircases and a special plastic covering over the staircase, explains the mayor. – in addition, seedlings will be painted red with a special bituminous paint to increase the level of attention to pedestrians”. This was reported in the Ternopil city CouncilÏåðåâåäåíî ñåðâèñîì "ßíäåêñ.Ïåðåâîä÷èê": translate.yandex.ru.
Source: http://uzinform.com.ua/