Installation of air conditioning: What you need to know?
To with your a / C nyaka problems and the unit worked for a long time, it the right way, montonati. Also important role is the role of commissioning. Air conditioners are of 2 types:
theone piece
This is such conditioners, which is part of the device output. They are divided into mobile and embedded (window). Mobile air conditioning install easier. They can be placed anywhere, the main thing - to be able to bring out the hose.
built-in air conditioners is also quite easy to install. To install such a device, it is necessary in the designated hole pre-prepared brackets that fasten to the wall with anchor bolts, use a drill. You may need a hacksaw if the brackets or angles will need to trim.
Split systems
This is 2 interconnecting units (one mounted outside and the other stays in the room). Installation of air conditioners of this type is much more complicated, but for the professional installers is quite doable in 1 day. Once in the room matched the location of the indoor unit to the fa?ade of the building displays outdoor unit.
it Should be remembered that between the systems freon very short cord, and air should not be above the bed (your bed or couch animals) and directly above the appliances. When working with the outdoor unit you need to keep in mind that it weighs 50 kg, therefore, the brackets must be securely mounted.
to protect the device from rain, and also from the aggressive enemies, you can do the visor or to enclose the unit lattice. When inside and outside the premises and installation work will be finished, it will be necessary to connect the units freon hoses.
Freon tube is also inside the copper tube, through which during operation of the device and enters the coolant. To this tube to conduct, need to drill the wall. If you apply for this cheap drill, it can cause cracks in the plaster or chipped by the openings. It is better to use a good punch.
then you just need to mount the drainage system (tube to drain condensed liquid). It is necessary to withdraw the drain. Leave the tube open to the water from it dripping near the house - illegally. Everything you need for a complete installation of instrument systems are sold complete with air conditioning.
After installation of the air conditioner will need to include it in the mains. It is desirable to hold the shield single wire. This will eliminate the risk of overloading the wiring, since the air conditioner is a device of great power. The wiring is quite simple and will not take much time. If stroebe wall is not possible, it is possible to hold the outer transaction. When carefully performed it will not spoil the appearance of the premises.
Before starting the air conditioner must remove freon from the air hose, which got there during Assembly, and fill it with freon. The air from the tubes need to be ruled out completely, this will need a special vacuum technique. If you stay even a tiny amount of air, it will cause quick failure of the device.
Next, the launch of the system in operation run in all modes of operation, initial setup and consultation of the client for further operation.
Ïåðåâåäåíî ñåðâèñîì "ßíäåêñ.Ïåðåâîä÷èê": translate.yandex.ru.
Source: http://uzinform.com.ua/